Optimization of Grit Changing Time Duration In Coated Disc Manufacturing Plant By Using PLC Automation
Avisek Jana
, Dr. Marpu Indira Rani
plc automation, production rate, time duration, coated abrasive
• The objective of this work is to optimize the grit changing time for efficiency of production uptime at the same time to reduce labor and working time and as well as increase the productivity. Idea behind this work is to control the quantity and quality of abrasive products caused by high level automation, latest technology and equipments. And the same time the rapid growth of the abrasive market capacity.• In order to satisfy the grit changing time reduce as well as quantity and quality of abrasive products, modification of high speed maker machine with automatic control system based on Allen Bradely PLC 1756 is introduced in details
"Optimization of Grit Changing Time Duration In Coated Disc Manufacturing Plant By Using PLC Automation", IJEDR - INTERNATIONAL JOURNAL OF ENGINEERING DEVELOPMENT AND RESEARCH (www.IJEDR.org), ISSN:2321-9939, Vol.5, Issue 4, page no.1071-1077, December 2017, Available :https://rjwave.org/IJEDR/papers/IJEDR1704172.pdf
Volume 5
Issue 4,
November-2017
Pages : 1071-1077
Paper Reg. ID: IJEDR_171452
Published Paper Id: IJEDR1704172
Research Area: Mechanical EngineeringÂ
Country: howrah, west bengal, India
DOI: http://doi.one/10.8/ijedr.17493
ISSN: 2321-9939 | IMPACT FACTOR: 9.37 Calculated By Google Scholar | ESTD YEAR: 2013
An International Scholarly Open Access Journal, Peer-Reviewed, Refereed Journal Impact Factor 9.37 Calculate by Google Scholar and Semantic Scholar | AI-Powered Research Tool, Multidisciplinary, Monthly, Multilanguage Journal Indexing in All Major Database & Metadata, Citation Generator
Publisher: IJEDR (IJ Publication) Janvi Wave